Jiangsu Chengxing Phosphorus Chemical Co., Ltd

2022-05-13

新闻9.jpg


Heat source condition: saturated steam

Pressure: 3.1MPaA

Flow: 50t / h (25 tons of takeout is extracted midway)

Total installed capacity: 5,200 k W

Net power generation: 4,191 k W

Annual power generation: 30.175 million KWH (the annual running time is 7,200 hours)

Annual benefit: 21.122 million yuan

Annual standard coal saving: 10,561 tons

Annual CO2 emission reduction: 25,100 tons


网站地图Shanghai GEO: Instrumented Rapid Load Test China . Instrumented Pile Load Test China